|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| Metal Coating: | Gold |
| Mode of Production: | SMT |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Canmtech is a professional 15years OEM manufacturer for PCB design, PCB production, component souring and SMT assembly, our services includes:
PCB Design Process
• Acquire all information needed, reviewing and verifying the accuracy.
• Schematic capture and net list generation (if not done yet).
• Create part library for the project.
• PCB component placement.
• Submit intermediate placement to engineer for reviewing. This is usually a discussion-modification process until get approval on final placement.
• PCB routing. PCB designer and engineer must maintain adequate and frequent communication during the routing process.
• Complete PCB layout, finalize all documents.
• Provide as accurate information of circuit design and system requirement as possible.
• Avoid/minimize change on schematic after PCB layout process begins.
• Reducing density and making practical requirement.
• Choose responsible and highly skilled PCB designers.
• Schematics and BOM if the schematic capture process involved in the design order.
• Assembly drawings.
• Assembly machine pick-place data file.
• Solder paste stencil files.
• Other optional files as client required.
| PCB | ||
| Layer | Quick Turn/Usual Time | Mass production |
| 2L | 24hours/ 4-5days | 8-10days |
| 4L | 48hours/ 6-7days | 10-12days |
| 6L | 72hours/ 7-8days | 12-14days |
| 8L | 72hours/ 8-10days | 16-18days |
| 10L | 96hours/ 12-14days | 18-20days |
| ... | ... | ... |
| Assembly | ||
| Quantity | Usual Time | |
| <20pcs | 2days | |
| 20-100pcs | 3days | |
| 100-1000pcs | 6days | |
| >1000pcs | Depend on BOM |